The schedule
Four weeks, week by week
The reason this is a schedule rather than an estimate is that the starting point is working software. We are not deciding how the system should work — that is settled and in production before your project begins.
What follows is the whole of it: the four weeks, the conditions the date rests on, when it does not apply, and what happens once it is over. If any of it looks like it would not survive contact with your situation, that is exactly the thing to raise on the first call.
The one that moves the date
asked in week one
Can your current system export its data? Almost every timeline that slips, slips there.
We ask before quoting, not in week three. If the answer is no, extraction becomes its own piece of work with its own date.

Why we are quick
Speed comes from what is already built
Not from working longer hours, and not from cutting things out. Four reasons, and none of them is heroics.
We do not start from scratch
We already run our own HR, invoicing and training software. Yours starts from something that works. Nobody spends a month deciding how it should be built.
The hard choices are already made
Fast projects go wrong when big decisions get rushed. Here those decisions were made years ago, and they have been running ever since.
A senior person owns your project
Nobody joins your project after a short interview. They join after months of work we have checked ourselves, on these same systems.
We agree what is included first
We write down what is in and what is not before we start. Anything that could push the date, like data we cannot get out of your old system, we find in week one.
The four weeks
Week 1
Your data, in the running system
We start from software that already works and load it with your kind of data. By the end of week one you are looking at something real, not a drawing.
Week 2
Your workflows and roles
Who approves what, who can see what, and the rules that make it your process rather than ours. Most of the truly custom work happens here.
Week 3
Integrations and migration
Linking up the software you already use, and moving your records across. Messy data shows up here, which is why we would rather look at it early.
Week 4
It goes live
You start putting real work through it. Not a prototype and not a demo. A working system covering what you agreed at the start.
Conditions, not caveats
What the four weeks assumes
A fixed date only means something if both sides know what it rests on. Here are those conditions, up front, rather than discovered in week three.
Scope is agreed first
We write down what is included before we start. Adding to it later moves the date. That is normal, and far easier to handle when it was said out loud beforehand.
Your data can be exported
Moving your records assumes your current software can export them. If it cannot, getting the data out becomes its own job with its own date.
Someone on your side can decide
Four weeks needs answers in days, not fortnights. One person who can settle a question does more for the date than any amount of engineering.
Said before you ask
When it is not four weeks
Some work takes longer. Very large programmes. Jobs spanning many systems. Regulated work with audit duties. And moving data out of software that cannot export it. We say so in the first conversation, not at the end of week four.
The full detail is in our terms, which set out exactly what a four-week engagement includes and excludes.
Week five onwards
What happens after
Nothing about the four weeks locks you into anything afterwards. Here are the three things that actually happen, in order of how often.
You run it, we hand it over
A handover session and a written runbook covering deployment, backups, access and the things that will need attention. You own the code and the data. Taking it in-house is a handover, not a negotiation.
The next module
The second thing is faster than the first, because the foundation, the identity model and the deployment path are already in place. This is the common path — HR first, then invoicing, then whatever hurts next.
Support, quoted separately
If you want us to keep the lights on, that is a separate agreement with its own price. We never fold it invisibly into the build. Ending support should never feel like losing the system.
Asked and answered
Common questions
How can it be four weeks when other agencies quote months?
What exactly do I get at the end of four weeks?
When does four weeks not apply?
What does the 10,000 rupee fee cover?
Who actually builds it?
Who owns the code and the data?
What happens after week four?
We already have a system. Does that make it harder?
Does the four weeks apply to AI projects too?
How is corporate training scheduled?